Categories
- Airport Works
- Bridges
- Buildings
- Design
- DTMP
- Environment Engineering
- Feasibility
- Geo-technical Investigation Works
- Irrigation
- Motorable
- Ongoing Projects
- Research
- Resources
- River Training
- Roads
- Structural Engineering
- Supervision
- Suspension
- Technical Audit
- Technical Audit & Project Evaluation
- Trail Bridge
- Trail Bridges
- Tunnel Study Works
- Uncategorized
- Water Resources
Category Archives: Tunnel Study Works
Cost Estimate and Bid Document Preparation of EPC Model of Posta Bahadur Bogati (Bhimphedi-Kulekhani) Tunnel ConstructionProject for MoPID, Bagmati Province, Nepal, July 2020
Project Feature : Twin Tube Tunnel (7.5m wide and 6.6 m high), T1 -3.20 Km and T2 – 3.17 Km in Length, Approach road approximately 1.9 KM IN Bhemphedi side and approximately 0.6 km in Kulekhani side with bridges and … Continue reading
Posted in Tunnel Study Works
Leave a comment
Feasibility Study of 5 Road Tunnels for Quality Research and Development Center, DoR, June 2020
Feasibility Study of; Kulekhani – Bhimphedi Tunnel : 3.165 Km Banepa-Sindhuli Sadak (Khurkot-Sindhuli Khanda) Tunnel : 6.453 Km Pokhara-Baglung Road (Hemja Nayapul Khanda) Tunnel : 7.053 Km Lamabagar Road Tunnel : 1.451 Km Butwal – Naryanghat (Daunne Khanda) Road Tunnel … Continue reading
Posted in Tunnel Study Works
Leave a comment