Detail Engineering Survey, Design, Drawing and Cost Estimate Preparation of Provincial 135 KM Roads for Province 5 in Rolpa District under Contract Package No TID/Pr5/RFP/2075-76/11.

This entry was posted in Ongoing Projects. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *