Detailed Engineering survey, Design, Preparation of Drawings, Cost Estimate and Report Preparation of Storm Drainage Improvement and Construction Underground Hume Pipe Drain.

    Project Name: Detailed Engineering survey, Design, Preparation of Drawings, Cost Estimate and Report Preparation of Storm Drainage Improvement and Construction Underground Hume Pipe Drain.
    Client: Trbhuvan International Airport Improvement Project Directorate.
    Contract Amount (NRS)    :    4,95,528.00
    Completion date    :    Dec-2005

Scope of the work:

  • survey
  • Design
  • Preparation of Drawings
  • Cost Estimate
  • Report Preparation
This entry was posted in Uncategorized and tagged , , , , . Bookmark the permalink.