Ghurmi – Chatara Road (20 km)

  • Project Name: Ghurmi – Chatara Road
  • Type – Design of Road
  • Length – 20.06 Km
  • Client – Mid Hill Highway (Puspalal) Project, Babarmahal, Kathmandu
  • Contract Amount (NRS) – 915,059.29

ghurmi_chatara

The project was completed in July of 2011. The scope of the project included:

  • Detail Engineering Survey
  • Design of road and road side structures,
  • Preparation of drawings and
  • Preparation of Detail Project Report
This entry was posted in Design. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *