Utility Survey and Report Preparation of Kathmandu Tribhuvan international Airport

Utility Survey and Report Preparation of Kathmandu Tribhuvan international Airport for Civil Aviation Authority of Nepal Engineering Department, January 2016

Scope of Works:

  • Conducting Ground Control Point re-survey (DGPS), detail topography (utility) site survey including identification of existing cables and utilities.
  • Topographical Drawings
  • Preparation of Survey Report and Photographic Report
  • Daily Progress Report along with photographs
  • Preparation of Drawing and Report
This entry was posted in Airport Works. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *